- Expert Faculty Guidance
- Updated Study Material
- Mock Tests & Practice Quiz
- Live Doubt Solving Sessions
- Exam-Oriented Preparation
- Motivation & Success Strategy
SSC MTS 2027: Work and Time Basics for MTS
15/11/2026
SSC MTS 2027: Work and Time Basics for MTS
Work and Time is an important arithmetic topic for competitive examination preparation. In SSC MTS 2027 Numerical Ability, questions from this topic may involve individual work, combined work, efficiency, work ratios and the number of workers required to complete a task.
Understanding the relationship between work, time and efficiency can make these questions easier to solve. In this guide, you will learn important formulas, shortcut methods, solved examples and 15 practice MCQs with answers and explanations.
What You Will Learn
- Basic concepts of Work and Time
- Important formulas and shortcuts
- Individual and combined work
- Efficiency and work ratio
- Workers and days-based questions
- 15 MCQs with answers and explanations
1. What Is Work and Time?
Work and Time is a mathematical concept used to calculate how long a person or group of people takes to complete a particular task.
For example, if a person completes a job in 10 days, the person completes 1/10 of the work in one day, assuming the same working rate every day.
Example: If Ravi completes a task in 5 days, his one-day work is:
One-day work = 1/5
This means Ravi completes one-fifth of the total work in one day.
2. Important Work and Time Formulas
1. One-Day Work
One-Day Work = 1 / Total Days
2. Total Work
Work = Efficiency × Time
3. Time Required
Time = Total Work / Efficiency
4. Combined Work
Combined One-Day Work = A's Work + B's Work
5. Workers and Days
M₁ × D₁ = M₂ × D₂
6. Efficiency and Time
Efficiency Ratio = Inverse of Time Ratio
Remember: The workers-and-days formula applies when all workers have the same efficiency and work at the same rate under comparable conditions.
3. Short Methods to Solve Work and Time Questions
Method 1: Find One-Day Work
If a person completes a task in a given number of days, divide the total work by those days to find the work completed in one day.
Example: A can complete a job in 12 days. How much work does A complete in one day?
One-day work = 1/12
Answer: 1/12 of the work
Method 2: Combined Work Shortcut
When two people work together, add their individual one-day work rates.
Formula:
Time taken together = (A × B) / (A + B)
This shortcut applies when A and B represent the number of days each person takes individually.
Example: A can complete a task in 10 days and B can complete it in 15 days. Find the time taken together.
Time = (10 × 15) / (10 + 15)
= 150 / 25
Answer: 6 days
Method 3: Efficiency Ratio
Efficiency and time are inversely proportional when the total work is the same.
Example: A completes a task in 10 days and B completes it in 20 days. Find their efficiency ratio.
A : B = 1/10 : 1/20
Multiply both sides by 20.
Answer: 2 : 1
A is twice as efficient as B.
Method 4: Workers and Days Shortcut
If the number of workers increases, the time required to complete the same work decreases, assuming equal efficiency.
Example: 10 workers complete a job in 12 days. How many days will 15 workers take?
10 × 12 = 15 × D
D = 120 / 15
Answer: 8 days
Method 5: Work Remaining
When a person completes part of a task, subtract the completed work from the total work to find the remaining work.
Example: A can complete a task in 10 days. How much work remains after working for 4 days?
One-day work = 1/10
Work completed in 4 days = 4/10 = 2/5
Remaining work = 1 − 2/5
Answer: 3/5 of the work
4. Solved Work and Time Questions for SSC MTS 2027
Example 1: Individual Work
Question: A can complete a task in 15 days. How much work will A complete in 5 days?
Solution:
One-day work = 1/15
Work in 5 days = 5/15 = 1/3
Answer: 1/3 of the work
Example 2: Two People Working Together
Question: A can complete a task in 12 days and B can complete it in 18 days. Find the time taken by both together.
Solution:
A's one-day work = 1/12
B's one-day work = 1/18
Combined work = 1/12 + 1/18
= 3/36 + 2/36 = 5/36
Time = 36/5
Answer: 7.2 days
Example 3: Find the Efficiency Ratio
Question: A completes a job in 8 days and B completes the same job in 12 days. Find their efficiency ratio.
Solution:
Efficiency ratio = 1/8 : 1/12
Multiply both sides by 24.
Answer: 3 : 2
Example 4: Workers and Days
Question: 8 workers complete a task in 15 days. How many days will 12 workers take to complete the same task?
Solution:
8 × 15 = 12 × D
D = 120/12
Answer: 10 days
Example 5: Work Remaining
Question: A can complete a job in 20 days. After working for 5 days, what fraction of the work remains?
Solution:
Work completed = 5/20 = 1/4
Remaining work = 1 − 1/4
Answer: 3/4 of the work
Example 6: One Person Joins Later
Question: A can complete a task in 12 days and B can complete it in 24 days. A works alone for 4 days, after which B joins. Find the total time taken to complete the work.
Solution:
A's one-day work = 1/12
Work completed by A in 4 days = 4/12 = 1/3
Remaining work = 1 − 1/3 = 2/3
Combined one-day work = 1/12 + 1/24 = 3/24 = 1/8
Time for remaining work = (2/3) ÷ (1/8) = 16/3 days
Total time = 4 + 16/3 = 28/3 days
Answer: 9⅓ days
5. Important Work and Time Shortcuts
| Question Type | Shortcut |
|---|---|
| One-day work | 1 ÷ Total days |
| Two people together | AB ÷ (A + B) days |
| Efficiency ratio | Inverse of time ratio |
| Workers and days | M₁D₁ = M₂D₂ |
| Remaining work | Total work − Completed work |
| Combined efficiency | Add individual work rates |
6. Common Mistakes to Avoid
- Adding days instead of work rates: For combined work, add one-day work rates, not the number of days.
- Confusing efficiency and time: Higher efficiency means less time for the same work.
- Ignoring remaining work: Calculate the completed portion before finding the time needed for the remaining task.
- Using the workers-days formula incorrectly: Check that workers have equal efficiency and are doing the same amount of work.
- Making fraction calculation errors: Find the LCM carefully when adding work rates.
7. Work and Time Practice MCQs for SSC MTS 2027
Practise these 15 questions to check your understanding of Work and Time. Try solving them using the shortcut methods before checking the answer key.
Question 1
A can complete a task in 10 days. What fraction of the work will A complete in one day?
A) 1/5 B) 1/10 C) 1/15 D) 1/20
Question 2
A can complete a task in 12 days. How much work will A complete in 5 days?
A) 1/2 B) 5/12 C) 1/3 D) 2/3
Question 3
A can complete a job in 10 days and B can complete it in 20 days. How many days will they take together?
A) 5 days B) 6⅔ days C) 8 days D) 10 days
Question 4
A can complete a task in 15 days and B can complete it in 10 days. Find the time taken together.
A) 5 days B) 6 days C) 8 days D) 12 days
Question 5
12 workers can complete a task in 10 days. How many days will 15 workers take to complete the same task?
A) 6 days B) 8 days C) 10 days D) 12 days
Question 6
A can complete a task in 8 days and B in 12 days. A works alone for 3 days. How many more days will B take to finish the remaining work alone?
A) 5 days B) 6 days C) 7.5 days D) 9 days
Question 7
6 workers complete a job in 12 days. How many days will 9 workers take to complete the same job?
A) 6 days B) 8 days C) 9 days D) 10 days
Question 8
A can complete a task in 20 days and B can complete it in 30 days. How many days will they take together?
A) 10 days B) 12 days C) 15 days D) 18 days
Question 9
4 workers can complete a task in 15 days. How many days will 6 workers take to complete it?
A) 8 days B) 10 days C) 12 days D) 14 days
Question 10
A can complete a job in 12 days and B in 18 days. Find the time taken by both together.
A) 6 days B) 7.2 days C) 8 days D) 9 days
Question 11
8 workers complete a task in 15 days. How many workers are required to complete the same task in 12 days?
A) 8 B) 9 C) 10 D) 12
Question 12
A can complete a task in 16 days and B in 24 days. Find their efficiency ratio.
A) 2 : 3 B) 3 : 2 C) 4 : 3 D) 1 : 2
Question 13
A can complete a job in 12 days and B in 24 days. A works alone for 4 days, then B joins. Find the total time required.
A) 7 days B) 8 days C) 9⅓ days D) 10 days
Question 14
5 workers complete a job in 20 days. How many days will 10 workers take to complete the same job?
A) 5 days B) 8 days C) 10 days D) 15 days
Question 15
A can complete a task in 8 days and B in 24 days. How many days will they take together?
A) 4 days B) 5 days C) 6 days D) 8 days
Answer Key with Explanations
| Q. | Answer | Short Explanation |
|---|---|---|
| 1 | B) 1/10 | One-day work = 1/10. |
| 2 | B) 5/12 | Work in 5 days = 5 × 1/12 = 5/12. |
| 3 | B) 6⅔ days | Time = (10 × 20) ÷ (10 + 20) = 200/30 = 6⅔ days. |
| 4 | B) 6 days | Time = (15 × 10) ÷ (15 + 10) = 150/25 = 6 days. |
| 5 | B) 8 days | 12 × 10 = 15 × D; D = 8 days. |
| 6 | C) 7.5 days | A completes 3/8. Remaining = 5/8. B's rate = 1/12. Time = (5/8) × 12 = 7.5 days. |
| 7 | B) 8 days | 6 × 12 = 9 × D; D = 8 days. |
| 8 | B) 12 days | Time = (20 × 30) ÷ (20 + 30) = 600/50 = 12 days. |
| 9 | B) 10 days | 4 × 15 = 6 × D; D = 10 days. |
| 10 | B) 7.2 days | Time = (12 × 18) ÷ (12 + 18) = 216/30 = 7.2 days. |
| 11 | C) 10 | 8 × 15 = M × 12; M = 10 workers. |
| 12 | B) 3 : 2 | Efficiency ratio = 1/16 : 1/24 = 3 : 2. |
| 13 | C) 9⅓ days | A completes 4/12 = 1/3. Remaining = 2/3. Combined rate = 1/12 + 1/24 = 1/8. Remaining time = 16/3 days. Total = 4 + 16/3 = 9⅓ days. |
| 14 | C) 10 days | 5 × 20 = 10 × D; D = 10 days. |
| 15 | A) 6 days | Combined rate = 1/8 + 1/24 = 4/24 = 1/6. Time = 6 days. |
8. 7-Day Work and Time Practice Plan
| Day | Practice Topic |
|---|---|
| Day 1 | Understand basic Work and Time concepts and formulas. |
| Day 2 | Practise individual work and one-day work questions. |
| Day 3 | Solve combined work questions. |
| Day 4 | Revise efficiency and work ratio questions. |
| Day 5 | Practise workers and days-based questions. |
| Day 6 | Solve remaining work and mixed MCQs. |
| Day 7 | Take a timed practice test and review mistakes. |
9. Prepare for SSC MTS 2027 with Katara Academy
Regular practice can help you improve your calculation speed and accuracy in Numerical Ability. Understand the basic concepts, revise important formulas and solve different types of Work and Time questions.
Prepare Smarter with Katara Academy
Strengthen your Mathematics fundamentals and practise important questions with structured exam preparation.
10. Frequently Asked Questions (FAQs)
1. What is Work and Time in Mathematics?
Work and Time is a mathematical topic used to calculate how much work a person or group completes in a given period and how long a task takes.
2. What is the formula for one-day work?
One-day work = 1 ÷ Number of days required to complete the entire task.
3. How do I calculate the time taken by two people working together?
Add their individual one-day work rates. For individual times A and B, the combined time is (A × B) ÷ (A + B).
4. What is the relationship between efficiency and time?
For the same amount of work, efficiency and time are inversely proportional. A more efficient worker takes less time.
5. How do I solve workers and days questions?
When all workers have equal efficiency, use M₁ × D₁ = M₂ × D₂ to find the unknown number of workers or days.
6. What is the formula for total work?
Total work = Efficiency × Time. The units must be consistent.
7. How can I calculate remaining work?
Subtract the work already completed from the total work. If total work is 1, remaining work = 1 − completed work.
8. What happens when more workers join a task?
If all workers have equal efficiency and work simultaneously, adding more workers reduces the time required for the same task.
9. How can I improve my speed in Work and Time questions?
Learn one-day work, combined work and efficiency methods. Practise fraction calculations and solve timed questions regularly.
10. How should I practise Work and Time for SSC MTS 2027?
Start with individual work questions, then practise combined work, efficiency, workers and days, and remaining work problems. Finish with mixed MCQs and timed tests.
Conclusion
Work and Time questions become easier when you understand one-day work, combined efficiency and the relationship between workers and days. Learn the formulas, practise the shortcut methods and review your calculation mistakes regularly. Use the solved examples and MCQs in this guide to strengthen your Numerical Ability preparation for SSC MTS 2027.
Recommended Articles
Related Articles









